Steinecker (600 hl x 8 brews / day) ---- SOLD ----

1. Malt handling

All manufactured by Künzel, built 1988

- Malt acceptance by „weigh cells“ with stock placement in malt silo plant, 40 tons/h, with dump gutter, tube magnet, trough chain conveyor, elevator, 2 calibrate scales

- 2 Malt acceptance silos standing on weigh cells with malt return and load device

- Malt silo plant wit 4 cells each 85 tons

- Malt cleaning – weigh – and warm water humidify plant

- Künzel-6-roller grist mill, E 25/150 for up to 8.000 kg/h cond. Lauter tun grist

- Malt grist container with 3 divisions (2 for husk + 1 flour and semolinas) for total 12.500 kg, mashing in performace 10 min.

- 2 dust removal plants

- dust container with later addition into the spent grains bunker

.

2. Brewhouse Equipment

5 vessel brewhouse in stainless steel (8 Brews x 600 hl / day), built in 1991.

- 2 Mash copper with 670 hl content, Ø: 5.500mm, with bottom- and wall heating areas, Vapour condenser

- biological wort acidification plant with 5 container

- Lautertun with 946 hl content, Ø: 8.300mm, with 6-arm raking machine, 2 spent grains flaps

- Spent grains bunker with 23 m³ content and suitable air compressor

- Trubtank 42 hl content

- Last runnings tank 110 hl content

- 2 low pressure – Whirlpoolcopper with 990 hl content, Ø: 5.800mm

- Exterior cooker plant for evaporation of 8% for heating with fresh steam (50 m²) and vapour (250 m²)

- Vapour compressor

- Vapour condenser

- Hops addition device with 5 kettles

- Wort cooler, make Schmidt Bretten, 720 hl/h, single-stage

- Wort aeration

- CIP

- Concentrate station

- Air conditioning for Brewhouse building

- Spent grains silo

- Transformers 2 x 600 kVA

- Water treatment with cations- + anions exchanger, built 1990

.

.

eZ Publish™ copyright © 1999-2010 eZ Systems AS